Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Power Plant Engineering – Fertigung

Planning, design and manufacturing of large power plants and nuclear power plant components in the GDR.

PO

VEB Kombinat Kraftwerksanlagenbau

Berlin · Radebeul · Pirna · DresdenNew on Amplifa

1969Founded
1990Dissolution in the course of the peaceful revolution
BerlinRegistered seat of the combine
People-owned enterprise (combine), GDRLegal form
Karl Rambusch (Division DirectorManagement

About the Combine

The VEB Kombinat Kraftwerksanlagenbau was a people-owned combine in the GDR founded in 1969 and headquartered in Berlin, subordinate to the Ministry for Coal and Energy. Its scope of activities comprised the planning and design of large power plants as well as the manufacture of power plant components and sub-systems. The combine conceived nuclear energy programmes, handled site selection for nuclear power plants, developed construction technologies and coordinated the development, design, manufacture and testing of equipment for the production of fuel elements. Further tasks included assembly and commissioning of auxiliary systems of the primary circuit, equipment for the secondary circuit as well as water treatment and supply, transmission lines and transport routes. From 1976 the combine coordinated the expansion of the Greifswald nuclear power plant, units 5 and 6. In 1990 the combine was dissolved in the course of the peaceful revolution; the plant engineering sector became part of Kraftwerks- und Anlagenbau AG, which was sold by the Treuhandanstalt in 1992 and privatised again in 1994.

Site
Berlin
Processes
Planning and design of large power plants, Manufacture of power plant components and sub-systems, Conception of nuclear energy programmes, Site selection for nuclear power plants, Development of construction technologies, Assembly and commissioning of auxiliary systems of the primary circuit, Equipment for the secondary circuit, Water treatment and supply
Materials
Planning and design of large power plants
Founded
1969
Industries
Power plant engineering, Nuclear energy, Energy sector
  1. 01

    Conception of nuclear energy programmes

  2. 02

    Site selection for nuclear power plants

  3. 03

    Planning and design of large power plants

  4. 04

    Development and design of equipment

  5. 05

    Manufacture of power plant components and sub-systems

  6. 06

    Assembly and commissioning

Fields of Activity and Services

PLAN

Planning and design of large power plants

Planning and design services for conventional and nuclear power plants.

Combine Enterprises

Berlin

DE

Registered seat of the combine; VEB Kernkraftwerksbau and VEB Energieprojektierung

Radebeul

DE

VEB Kraftwerksbau (operation, from 1969)

Pirna

DE

VEB Scientific-Technical Centre for Power Plant Engineering (operation, from 1969)

Dresden

DE

VEB Dampfkesselbau Dresden-Übigau (combine enterprise until 1990, then combine shipbuilding)

Industries

Power plant engineeringNuclear energyEnergy sector

Additional services

Planning and design of large power plantsManufacture of power plant components and sub-systemsConception of nuclear energy programmesSite selection for nuclear power plantsDevelopment of construction technologiesAssembly and commissioning of auxiliary systems of the primary circuitEquipment for the secondary circuitWater treatment and supplyTransmission lines, roads and transport routesCoordination of development, design, manufacture and testing of equipment for the production ofCoordination of the expansion of the Greifswald nuclear power plant (units 5 and 6)

History

  1. 1950er

    Foundation of the VEB Atomkraftwerk (VEB AKW) for the development, planning and construction of nuclear power plants; it was subordinate to the Office for Nuclear Research and Nuclear Technology (AKK).

  2. 1955

    Release of nuclear research for the GDR by the Soviet Union; foundation of the AKK, the Scientific Council for the Peaceful Use of Atomic Energy and the Central Institute for Nuclear Physics Rossendorf

  3. 1963

    Berlin Pankow branch of the VEB Atomkraftwerk

  4. 1964–1966

    Dispute between VEB AKW and ZfK Rossendorf over the orientation of nuclear power use (pressurised water reactor vs. fast breeder)

  5. 1969

    Merger of VEB Kraftwerksbau Radebeul, VEB Kernkraftwerksbau Berlin, VEB Energieprojektierung Berlin and VEB WTZ Kraftwerksanlagenbau Pirna to form the VEB Kombinat Kraftwerksanlagenbau Berlin

  6. 1976

    Coordination of the expansion of the Greifswald nuclear power plant, units 5 and 6

  7. 1978

    After the dissolution of the VVB, the company bears the name 'Kombinat Kraftwerksanlagenbau' from July 1978

  8. 1990

    Dissolution of the combine in the course of the peaceful revolution; foundation of Kraftwerks- und Anlagenbau AG (KAB), which took over the plant engineering sector

  9. 1992

    Sale of KAB AG by the Treuhandanstalt to Kaneb-Furmanite (USA)

  10. 1994

    Rescission of the sale in early 1994; renewed privatisation

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo