
Planning, manufacture and installation of factory-prefabricated wall, ceiling and roof elements in timber frame construction

W+W Holzelementbau Nordbaden GmbH
Linkenheim-Hochstetten (DE)New on Amplifa
About us
W+W Holzelementbau Nordbaden GmbH was founded in 2017 by Christoph Waterstraat and Laszlo Wilmes in Linkenheim-Hochstetten and plans, manufactures and installs factory-prefabricated wall, ceiling and roof elements for construction projects in timber frame and timber panel construction. The company specialises in turnkey shell construction, including the airtight and weatherproof building envelope, the installation of windows and the waterproofing of roof surfaces. The wall surfaces are prepared inside and out so that plastering can begin immediately. Since mid-2019, structural engineering for timber and solid construction projects — covering structural analysis, design, thermal insulation and sound insulation — has additionally been offered in the company's own production hall. Insulation materials used include softwood fibre insulation from sustainable forestry. The service offering is aimed primarily at property developers, commercial customers and architects, with projects ranging from multi-storey residential construction and social and student housing to office and commercial buildings, roof extensions and annexes.
- Site
- Linkenheim-Hochstetten
- Processes
- Prefabrication of wall, ceiling and roof elements in timber panel construction, Timber panel construction / timber frame construction - planning, manufacture and installation, Structural engineering for timber and solid construction projects (structural analysis, design,, Structural engineering for timber and solid construction projects (since mid-2019), Planning (design phase: structural analysis, design, thermal insulation, sound insulation), Manufacture of factory-prefabricated wall, ceiling and roof elements, Installation, Turnkey shell construction incl. window installation and roof waterproofing
- Materials
- Wood, Softwood fibre insulation
- Founded
- 2017
- Employees
- 8
- Industries
- Property developers, Residential construction (multi-storey residential, social housing, student, Architects, Commercial customers / office and commercial buildings
- 01
Structural engineering and design planning (structural analysis, design,
- 02
Prefabrication of wall, ceiling and roof elements
- 03
Installation of the elements on the construction site
- 04
Turnkey shell construction incl. window installation and roof waterproofing
Materials and processes
Wood
Main material for wall, ceiling and roof elements in timber panel and timber frame construction.
Softwood fibre insulation
Insulation material from sustainable forestry for partition wall insulation and external thermal insulation composite systems.
Locations
Linkenheim-Hochstetten
DEProduction and administration
- Materials
- Wood, softwood fibre insulation
- Production hall (Römeräcker 10)
- Photovoltaic system for in-house power supply
Components and elements





Inside the production





Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Prefabrication of wall, ceiling and roof elements in timber panel constructionTimber construction/Manufacturing | – | – | – | – | Wood, Softwood fibre insulation |
| Timber panel construction / timber frame construction - planning, manufacture and installationTimber construction/Assembly | – | – | – | – | Wood |
| Structural engineering for timber and solid construction projects (structural analysis, design,Engineering | – | – | – | – | Wood |
Additional services
History
- 2017
Foundation of W+W Holzelementbau Nordbaden GmbH by Christoph Waterstraat and Laszlo Wilmes in Linkenheim-Hochstetten; start of construction of the production hall in August 2017
- 2018
Commissioning of production at the end of 2018 with two employees
- 2019
Since mid-2019, structural engineering for timber and solid construction projects in the company's own production hall; team grew to eight employees