
Technical building services in heating, ventilation, cooling and plumbing with in-house prefabrication of plant components.

Waning Anlagenbau GmbH & Co. KG
Vreden · ElsterwerdaNew on Amplifa
About Waning Anlagenbau
Waning Anlagenbau GmbH & Co. KG was founded in 1959 and, as a technical service provider, implements construction projects in the trades of heating, plumbing, ventilation and cooling, with a focus on industrial, commercial and hospital construction. With over 95 employees and revenue of around €17 million (2015), the company executes projects throughout Germany. A particular focus is the air conditioning of data centers: Waning contributed to the refrigeration equipment of more than 20 high-security data centers, including the SuperMUC at the Leibniz Supercomputing Centre in Munich with innovative warm-water cooling. At the company headquarters in Vreden, large plant components up to complete boiler houses are prefabricated in-house using plasma cutting, welding machines and assembly; 25 employees hold welding qualifications according to DIN EN 287. Further services include large-scale refrigeration systems with concrete core activation and chilled ceilings, modernization of boiler systems (CHP units, heat recovery, DDC), highly efficient HVAC systems with adiabatic cooling, and mobile heating and cooling containers. Reference projects include the Humboldt Karree in Berlin, the corporate headquarters of Ernstings Family in Lette, and the Gerry Weber Halle 30 in Düsseldorf.
- Site
- Vreden
- Processes
- Heating systems (installation), Ventilation systems (HVAC systems, also with adiabatic cooling), Refrigeration systems (large-scale refrigeration, free cooling, data center air conditioning), Plumbing installations, Prefabrication of large plant components up to complete boiler houses (plasma cutting, welding,, Welding of steel and stainless steel pipe systems (25 certified welders according to DIN EN 287), Production of mobile heating and cooling containers, Concrete core activation and chilled ceilings
- Materials
- Steel pipe, Stainless steel pipe
- Founded
- 1959
- Employees
- over 95 (brochure
- Industries
- Data centers/IT industry, Semiconductor industry, Automotive suppliers, Industrial companies, Commercial/office buildings, Hospital construction
- 01
Technical consulting and CAD planning
- 02
Prefabrication at the Vreden headquarters (plasma cutting, welding, assembly)
- 03
Leak testing
- 04
Transport to the construction site
- 05
On-site installation
- 06
Customer service and maintenance
Materials
Steel pipe
Installation of steel pipe systems for heating and cooling systems for the most demanding requirements.
Stainless steel pipe
Installation of stainless steel pipe systems by certified welders for highly stressed systems.
Locations
Vreden
DEHeadquarters with prefabrication
- Materials
- Steel, stainless steel
- Plasma cutting equipment
- Automated welding machines
- 5 CAD workstations
Elsterwerda
DEBranch office (Waning TGA)
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Heating systems (installation)Assembly | – | – | – | – | – |
| Ventilation systems (HVAC systems, also with adiabatic cooling)Assembly | – | – | – | – | – |
| Refrigeration systems (large-scale refrigeration, free cooling, data center air conditioning)Assembly | – | – | – | – | – |
| Plumbing installationsAssembly | – | – | – | – | – |
| Prefabrication of large plant components up to complete boiler houses (plasma cutting, welding,Joining | – | – | – | – | Steel, Stainless steel |
| Welding of steel and stainless steel pipe systems (25 certified welders according to DIN EN 287)Joining | – | – | – | – | Steel, Stainless steel |
| Production of mobile heating and cooling containersAssembly | – | – | – | – | – |
| Concrete core activation and chilled ceilingsAssembly | – | – | – | – | – |
| Modernization of existing boiler systems (heat-chill units, CHP, heat recovery,Assembly | – | – | – | – | – |
| Technical building planning (5 CAD workstations)Engineering | – | – | – | – | – |
| Leak testing of plant componentsTesting | – | – | – | – | – |
3 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Plasma cutting equipment | – | – | – | – | Vreden |
| Automated welding machines | – | – | – | – | Vreden |
| CAD workstations | – | 5 | – | – | Vreden |
Additional services
Reference customers
History
- 1959
Company founding; focus on heating, plumbing, ventilation, cooling for industrial, commercial and hospital construction
- 2006
Refurbishment of the Humboldt Karree Berlin (seat of the Senate Administration until July 2006), trades HVAC&S, contract volume €5.8 million
- 2013
Commissioning of SuperMUC at the Leibniz Supercomputing Centre in Munich with innovative warm-water cooling system; ventilation installation at Gerry Weber Halle 30 Düsseldorf
- 2014
Participation in Haus der freien Berufe Bonn for bonnvisio
- 2015
Revenue approx. €17 million, 92 employees