Drinking water supply and wastewater disposal in the Wittstock/Dosse association area with its own waterworks and wastewater treatment plants

Wasser- und Abwasserverband Wittstock
Wittstock/Dosse (16909)New on Amplifa
About the Wasser- und Abwasserverband Wittstock
The Wasser- und Abwasserverband Wittstock (WAV Wittstock) is a statutory association (Zweckverband) and a public-law corporation headquartered in Wittstock/Dosse, Brandenburg. The association operates the public drinking water supply and wastewater disposal in its association area, including the operation of waterworks, well facilities and wastewater treatment plants. The Wittstock waterworks supplies around 12,878 inhabitants (as of 31.12.2021) with fresh water; sewage removal is carried out in cooperation with AWU OPR. Since 2022, the association has operated its own ground-mounted PV systems at the Babitz well facility (60.0 kWp) and the Wittstock waterworks (51.0 kWp) in order to partially cover the electricity consumption of its operating facilities itself and reduce CO2 emissions. In addition, the association implements infrastructure measures such as the wastewater diversion from the Heiligengrabe wastewater treatment plant to the Wittstock wastewater treatment plant with funding from the State of Brandenburg.
- Site
- Wittstock/Dosse
- Processes
- Drinking water supply, Wastewater disposal, Operation of waterworks and wastewater treatment plants, Sewage removal (in cooperation with AWU OPR)
- Materials
- Ground-mounted PV systems
- Industries
- Water and wastewater management
- 01
Water extraction via well facilities
- 02
Drinking water treatment and distribution via waterworks and pipe networks
- 03
Wastewater collection and transport
- 04
Wastewater treatment in wastewater treatment plants
- 05
Sewage removal in cooperation with AWU OPR
- 06
Own electricity generation via ground-mounted PV systems
Tasks and Services
Ground-mounted PV systems
Own electricity generation of 60.0 kWp (Babitz well facility) and 51.0 kWp (Wittstock waterworks) for self-consumption by the operating facilities
Locations and Operating Facilities

Wittstock/Dosse
DERegistered office, administration and waterworks
- Wittstock waterworks (approx. 200,000 kWh electricity consumption p.a.)
- Ground-mounted PV system 51.0 kWp
Inside the production


Industries
Additional services
Projects and History
- 2020
Assessment of measures to reduce CO2; analysis of the load profiles of the operating facilities
- 2021
Award of the PV projects to Actemium H&F GmbH in December
- 2022
Commissioning of the ground-mounted PV systems Babitz well facility (60.0 kWp) and Wittstock waterworks (51.0 kWp) on 17.05.2022; construction acceptance on 15.06.2022
- 2022
Grant notifications for the PV systems under the RENplus 2014–2020 programme (ERDF/State of Brandenburg) in August
Construction measure: wastewater diversion from the Heiligengrabe wastewater treatment plant to the Wittstock wastewater treatment plant for the decommissioning of the Heiligengrabe wastewater treatment plant, funding from the State of Brandenburg 500,000 euros