Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Wi&Vi – Fertigung

Engineering office for the planning, design and realisation of railway electrification systems in Switzerland

Wi&Vi Logo

Wiederkehr & Villiger AG

Riedstrasse 1, CH-6343 RotkreuzNew on Amplifa

2015Founded
22Employees
Rotkreuz (CH)Location
AGLegal form

About us

Wiederkehr & Villiger AG (Wi&Vi) is an engineering office based in Rotkreuz (Zug) specialising in railway electrification. Founded in 2015, the company plans and realises overhead contact line and catenary systems, traction power supplies, switchgear and switching stations, service and depot facilities as well as return conductor systems and railway earthing. Its services include planning and design, approval procedures, construction and execution projects, site supervision and commissioning, as well as mast and cross-span calculations, overhead contact line control systems, safety-relevant key interlocking systems and multi-voltage AC/DC systems. For asset surveying, the contact wire position is recorded with a laser measuring device. Clients include SBB (framework agreement via IG Contact – rs ingénieurs SA + Wi&Vi AG), SOB and the Federal Office of Transport (BAV). The office was involved, among other things, in commissioning surveys of the Gotthard and Ceneri Base Tunnels as well as in major projects such as the capacity expansion of Bern West station and the Zurich–Winterthur Four-Track project (Mehr-Spur). In 2025 the company employs 22 staff.

Site
Rotkreuz
Processes
Planning, design, approval procedures, construction projects, execution projects, site supervision, Contact wire position survey with laser measuring device, Planning and design of railway electrification, Approval procedures, Construction and execution projects, Site supervision and commissioning, Overhead contact line and catenary, Mast and cross-span calculations
Materials
Overhead contact line and catenary, Traction power supply, Switchgear and switching stations, Return conductor system and railway earthing, Multi-voltage AC/DC systems, Contact wire position survey
Certificates
Laser measurement of contact wire position
Founded
2015
Employees
22
Industries
Railway electrification, Railway infrastructure, Traction power supply
  1. 01

    Planning and design

  2. 02

    Approval procedures

  3. 03

    Construction and execution projects

  4. 04

    Site supervision

  5. 05

    Commissioning

Services and Competencies

FLO

Overhead contact line and catenary

Planning and design of overhead contact line and catenary systems including mast and cross-span calculations.

BSV

Traction power supply

Design of traction power supply systems for railway infrastructure.

SA

Switchgear and switching stations

Planning of switchgear, switching stations and overhead contact line control systems.

RL

Return conductor system and railway earthing

Design of return conductor systems and railway earthing for electrical safety.

MSA

Multi-voltage AC/DC systems

Multi-voltage AC/DC systems with feed-in to the overhead contact line.

LM

Contact wire position survey

Recording of the contact wire position with a laser measuring device for asset surveying.

Location

Rotkreuz

CH

Headquarters / Office

Projects and Systems

Gotthard Base Tunnel – commissioning survey incl. access lines
Gotthard Base Tunnel – commissioning survey incl. access linesRailway electrification · Railway infrastructure
Capacity expansion Bern West station
Capacity expansion Bern West stationOverhead contact line · Railway infrastructure
SOB Service Centre Samstagern
SOB Service Centre SamstagernService and depot facilities · Railway infrastructure

Inside the production

Company founded in 2015
Company founded in 2015
New office premises Riedstrasse 1, Rotkreuz (2020)
New office premises Riedstrasse 1, Rotkreuz (2020)
IG Contact – cooperation with rs ingénieurs SA
IG Contact – cooperation with rs ingénieurs SA
10 years of Wi&Vi – anniversary 2025
10 years of Wi&Vi – anniversary 2025
First Wi&Vi summer party 2017
First Wi&Vi summer party 2017

Industries

Railway electrificationRailway infrastructureTraction power supply

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Planning, design, approval procedures, construction projects, execution projects, site supervisionEngineering–––––
Contact wire position survey with laser measuring deviceTesting–––––

Additional services

Planning and design of railway electrificationApproval proceduresConstruction and execution projectsSite supervision and commissioningOverhead contact line and catenaryMast and cross-span calculationsTraction power supplyService and depot facilitiesReturn conductor system, railway earthingSwitchgear and switching stationsContact wire position survey with laser measuring deviceOverhead contact line control systemsSafety-relevant key interlocking systemsMulti-voltage AC/DC systems

Reference customers

SBB (framework agreement via IG Contact - rs ingénieurs SA + Wi&Vi AG)SOB (Service Centre Samstagern project)BAV (plan approval dossiers MSZW and Bern West)

Quality and Measurement Technology

The contact wire position is recorded with a laser measuring device; the projects are submitted as part of the approval procedures with the Federal Office of Transport (BAV).

EvidenceRotkreuz
Laser measurement of contact wire position

History

  1. 2015

    Founding of Wiederkehr & Villiger AG on 23.09.2015 by Roger Wiederkehr, Herbert Villiger, Sandra Wiederkehr, Markus Greminger, Bruno Willimann and Patrick Fuchs

  2. 2016

    Commissioning survey of the Gotthard Base Tunnel incl. access lines

  3. 2018

    Team grows to 12 employees; start of the major project 'Capacity expansion Bern West station'

  4. 2019

    Team grows to 14 employees

  5. 2020

    Move into new office premises at Riedstrasse 1, Rotkreuz; start of the major project 'Four-Track Zurich–Winterthur' (MSZW); commissioning survey of the Ceneri Base Tunnel

  6. 2021

    Framework agreement with SBB via IG Contact – rs ingénieurs SA + Wi&Vi AG

  7. 2022

    Team grows to 19 employees; project start for the SOB Service Centre Samstagern

  8. 2023

    Expansion of the management board and succession arrangements; 20 employees; submission of the plan approval dossier to BAV for MSZW and Bern West

  9. 2024

    Herbert Villiger leaves the management board; Patrick Lustenberger becomes new substitute member

  10. 2025

    10 years of Wi&Vi; 22 employees

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo