Development and manufacture of switchgear cabinets, automation solutions and control systems for industry

Wolfgang Böck Schaltanlagenbau
Waltenhofen (Waltenhofen-Lanzen) · Dieselstr. 10New on Amplifa
About us
Wolfgang Böck Schaltanlagenbau was founded in 1990 and is a provider of automation solutions and switchgear cabinets for industry. Its range of services includes electrical engineering design with EPLAN and EPLAN Pro Panel, the construction of automation cabinets, installation and power distribution boards as one-offs and in series production, machine and plant automation as well as PLC programming and visualization with Rockwell, Siemens, Wago, CoDeSys and Bosch CS 2000 controllers. Further core competencies are plant modernization, cable assembly and module manufacturing, machine wiring, and commissioning including testing and measurement. A focus lies on industrial refrigeration, for which industry-specific programs, process systems and switchgear cabinets are developed, including performance test benches, cold storage warehouses and ice rinks and bobsleigh tracks. The company supplies customers in various industries throughout Germany and is based in Waltenhofen-Lanzen in the Allgäu region.
- Site
- Waltenhofen
- Processes
- Electrical engineering design (circuit diagram creation with EPLAN, 3-D design with EPLAN Pro Panel), Switchgear cabinet construction (automation cabinets as one-offs and in series, installation and, Machine and plant automation, PLC programming and visualization (Rockwell, Siemens, Wago, CoDeSys, Bosch CS 2000), Drive solutions (ABB, Siemens, Danfoss, SEW, Rockwell), Plant modernization (control and SCADA system technologies, PLC replacement), Cable assembly (custom cable harnesses as one-offs and in series), Module manufacturing (assembly of complex mechatronic system modules and complete devices)
- Materials
- Copper, Plastic
- Certificates
- Testing and measurement during commissioning
- Founded
- 1990
- Industries
- Special-purpose machinery, Packaging industry, Power generation and power distribution, Industrial refrigeration, Special-purpose vehicle manufacturing, Building automation
- 01
Electrical engineering design (EPLAN, EPLAN Pro Panel)
- 02
Switchgear cabinet construction / cable assembly and module manufacturing
- 03
Machine wiring
- 04
PLC programming and visualization
- 05
Commissioning incl. testing and measurement
Materials & Processes
Copper
Material for cable harnesses, lines and wiring in switchgear cabinets and modules.
Plastic
Used in cable assembly and module manufacturing, e.g. for insulation and housing components.
Locations

Waltenhofen (Waltenhofen-Lanzen)
DEHeadquarters / Manufacturing
- Lot size
- One-offs to series
- Materials
- Copper, plastic
- EPLAN
- EPLAN Pro Panel
Services & Components


Inside the production

Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Electrical engineering design (circuit diagram creation with EPLAN, 3-D design with EPLAN Pro Panel)Engineering | – | – | – | – | Copper (cables/lines, implied) |
| Switchgear cabinet construction (automation cabinets as one-offs and in series, installation andAssembly | – | – | – | 1 (one-off) – Series | Copper, Plastic |
| Machine and plant automationEngineering | – | – | – | – | – |
| PLC programming and visualization (Rockwell, Siemens, Wago, CoDeSys, Bosch CS 2000)Engineering | – | – | – | – | – |
| Drive solutions (ABB, Siemens, Danfoss, SEW, Rockwell)Engineering | – | – | – | – | – |
| Plant modernization (control and SCADA system technologies, PLC replacement)Engineering | – | – | – | – | – |
| Cable assembly (custom cable harnesses as one-offs and in series)Assembly | – | – | – | 1 (one-off) – Series | Copper, Plastic |
| Module manufacturing (assembly of complex mechatronic system modules and complete devices)Assembly | – | – | – | – | – |
| Machine wiring (at the customer's site or in-house)Assembly | – | – | – | – | Copper, Plastic |
| Commissioning (incl. testing and measurement)Testing | – | – | – | – | – |
| Industrial refrigeration (industry-specific programs, process systems and switchgear cabinets)Engineering | – | – | – | – | – |
| Installation of pneumatic componentsAssembly | – | – | – | – | – |
Additional services
Quality
Commissioning takes place in-house and at the customer's site with careful execution of all relevant tests and measurements.
| Evidence | Waltenhofen (Waltenhofen-Lanzen) |
|---|---|
| Testing and measurement during commissioning |
History
- 1990
Foundation of Wolfgang Böck Schaltanlagenbau
- 2025