Wotan Zement – Fertigung

Produces twelve cement types from limestone of the Hillesheim limestone basin in Üxheim-Ahütte, as silo, bag and big bag goods.

Wotan Zement Logo

Wotan Zement GmbH & Co. KG

54579 Üxheim-Ahütte (Administration) · 54579 Üxheim-Ahütte (Production, Loading)New on Amplifa

1923Founded
12Cement types
Üxheim-AhütteQuarries, plant and administration in the Vulkaneifel
25 kg / 50 kgBag sizes; silo and big bag goods additionally
VDZExternal monitoring by the Association of German Cement

About Wotan Zement

Wotan Zement GmbH & Co. KG is a medium-sized family company headquartered in Üxheim-Ahütte in the Vulkaneifel region. The basis of cement production is limestone from the Hillesheim limestone basin, which is extracted in several company-owned quarries. From limestone and marl, cement clinker is burned in a rotary kiln, which is subsequently ground with additives such as blast furnace slag, trass and limestone in ball mills into twelve cement types. The portfolio comprises Portland, Portland limestone, Portland slag, Portland pozzolanic (trass cement), blast furnace and composite cements according to EN 197-1 as well as soil and base layer binders according to DIN 18506. The products are loaded as silo goods, bagged goods (25 kg and 50 kg) and, on request, as big bags. Customers include construction sites, ready-mix concrete plants, precast concrete operations and the building materials trade. The delivery area covers Rhineland-Palatinate, the Saarland, southern North Rhine-Westphalia as well as Luxembourg, Belgium, the southern Netherlands and France.

Site
Üxheim-Ahütte
Processes
Cement clinker production (burning in rotary kiln), Cement grinding (cement production, 12 cement types), Quarry extraction (blasting, drilling), Crushing (hammer crushing), Bag loading (25 kg and 50 kg bags), Silo loading (bulk cement goods), Big bag filling (on request), Compressive strength testing
Materials
Limestone (Hillesheim limestone basin), Marl, Cement clinker, Portland cement CEM I 42,5 N, Portland cement CEM I 42,5 R, Portland limestone cement CEM II/A-LL 42,5 R, Portland slag cement CEM II/A-S 52,5 N, Portland composite cement CEM II/B-M (S-LL) 32,5 R
Certificates
External monitoring/quality monitoring VDZ (EN 197-1, DIN 18506, EN 413-1), BENOR certificate, KOMO certificate, AFNOR certificate, VDZ external monitoring (EN 197-1, DIN 18506, EN 413-1), ISO 9001
Founded
1923
Industries
Construction industry/construction sites, Ready-mix concrete plants, Precast concrete operations, Building materials trade, Infrastructure/transportation construction
  1. 01

    Quarry extraction (blasting, drilling)

  2. 02

    Drill cuttings analysis in the plant laboratory

  3. 03

    Crushing in the hammer crusher

  4. 04

    Burning of cement clinker in the rotary kiln with cyclone preheater

  5. 05

    Cooling of the clinker

  6. 06

    Cement grinding in ball mills with separator operation

  7. 07

    Silo loading, bag loading (rotor packer, palletizer) or big bag filling

Locations

Standort Üxheim-Ahütte (Administration)

Üxheim-Ahütte (Administration)

DE

Administration

Standort Üxheim-Ahütte (Plant)

Üxheim-Ahütte (Plant)

DE

Loading, Inbound, Production

Materials
Limestone, marl, cement clinker, cement
  • Hammer crusher
  • Rotary kiln with cyclone preheater
  • Cooler system
  • Ball mills with separator operation
  • Rotor packer
  • Palletizer
  • Bag filter
  • Plant laboratory

Products and loading

Silo goods
Silo goodsCement loading · Ready-mix concrete plants and building materials trade
Bagged goods (25 kg / 50 kg)
Bagged goods (25 kg / 50 kg)Bag loading · Construction sites and building materials trade
Big bags
Big bagsBig bag filling on request · Construction industry

Inside the production

Quarry in the Hillesheim limestone basin
Quarry in the Hillesheim limestone basin
Hammer crusher
Hammer crusher
Rotary kiln
Rotary kiln
View into the rotary kiln
View into the rotary kiln
Ball mill
Ball mill
Bag loading
Bag loading
Silo loading
Silo loading
Compressive strength testing in the plant laboratory
Compressive strength testing in the plant laboratory

Industries

Construction industry/construction sitesReady-mix concrete plantsPrecast concrete operationsBuilding materials tradeInfrastructure/transportation construction

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Cement clinker production (burning in rotary kiln)Casting––––Cement clinker, Limestone, Marl
Cement grinding (cement production, 12 cement types)Other––––Cement clinker, Limestone, Trass, Blast furnace slag
Quarry extraction (blasting, drilling)Other––––Limestone, Marl
Crushing (hammer crushing)Other––––Limestone, Marl
Bag loading (25 kg and 50 kg bags)Other––25 kg – 50 kg–Cement
Silo loading (bulk cement goods)Other––––Cement
Big bag filling (on request)Other––––Cement
Compressive strength testingTesting––––Cement
Plant laboratory analytics (drill cuttings analysis, internal monitoring according to VDZ)Testing––––Limestone, Cement

9 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Hammer crusher––––Üxheim-Ahütte
Rotary kiln–––1963Üxheim-Ahütte
Cyclone preheater–––1963Üxheim-Ahütte
Ball mill––––Üxheim-Ahütte
Cement mill with separator operation–––1956Üxheim-Ahütte
Rotor packer––––Üxheim-Ahütte
Palletizer––––Üxheim-Ahütte
Bag filter–––2006Üxheim-Ahütte
Cooler system––––Üxheim-Ahütte

Additional services

Loading as silo goods, bagged goods and big bags (on request)In-house quality control/plant laboratoryConsulting on products and loading times

Quality and monitoring

Quality assurance begins in the quarry with drill cuttings analysis performed by the company's own plant laboratory; intermediate and final products are continuously sampled and compressive strength is tested. Internal monitoring is complemented by external monitoring by the VDZ, which has been in place for many years, according to EN 197-1, DIN 18506 and EN 413-1; in addition, BENOR, KOMO and AFNOR certificates exist for individual types.

EvidenceÜxheim-Ahütte (Plant)
VDZ external monitoring (EN 197-1, DIN 18506, EN 413-1)
BENOR certificate
KOMO certificate
AFNOR certificate
ISO 9001

History

  1. 1923

    Foundation of a lime burning operation by the brothers Heinrich and Jean Schneider.

  2. 1935

    Conversion of the production program to Portland cement (mid of the 30s).

  3. 1956

    Construction of the first cement mill with more modern separator operation.

  4. 1963

    Erection of a new rotary kiln with cyclone preheater.

  5. 1965

    Death of the company founder Heinrich Schneider; Gisela Carnessali née Schneider and Dr. Bruno Carnessali take over the management.

  6. 1972

    Expansion of cement grinding capacity through new mills.

  7. 1996

    Expansion and improvement of cement grinding capacity through new mills.

  8. 2006

    Replacement of the electrostatic precipitator with a modern bag filter to reduce dust emissions.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo