Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Zehentner + Ingenieure – Fertigung

Execution-ready formwork, rebar, and precast element plans, as well as steel construction and BIM planning from Dreieich.

ZE

Zehentner + Ingenieure Technische Zeichnungen GmbH

DreieichNew on Amplifa

1986Founded
1.287+Projects
2020BIM certified by ALLPLAN
DreieichLocation Rhein-Main Area

About us

Zehentner + Ingenieure Technische Zeichnungen GmbH is a design office in Dreieich in the Rhein-Main area that has been active in technical drawings since 1986. The company creates structural framework drawings, formwork plans, reinforcement plans, steel construction summaries, as well as excavation support and borehole pile plans for high-rise, civil, and industrial construction projects. Additionally, precast element plans, 3D modeling, and BIM coordination are offered. The software ALLPLAN (Nemetschek) is used; since 2020, the company has been ALLPLAN BIM certified. Reference projects include Terminal 3 at Frankfurt Airport, the FAIR research facility in Darmstadt, the Omniturm in Frankfurt, as well as the Wannsee Terraces and the Berlin Palace. Customers are engineering offices and construction companies that support the team on a project basis or during capacity peaks—from the initial coordination to the coordinated plan submission.

Site
Dreieich
Processes
Structural framework drawings, Formwork plans, Reinforcement plans, Steel construction overview planning, Excavation support and borehole pile plans, 3D modeling & BIM coordination, Precast element plans, Steel construction and specialized planning (Overview, excavation support, borehole pile plans)
Materials
Reinforcing steel, Steel, Reinforced concrete, Concrete (Precast elements), Concrete / Reinforced concrete, BIM / 3D modeling
Certificates
BIM certified by ALLPLAN, BIM Certification (ALLPLAN)
Founded
1986
Industries
High-rise construction, Civil engineering, Industrial construction, Engineering offices, Construction companies
  1. 01

    Project inquiry and coordination

  2. 02

    Technical drawing / Construction (2D)

  3. 03

    3D modeling with ALLPLAN

  4. 04

    BIM coordination with project stakeholders

  5. 05

    Review by project management

  6. 06

    Coordinated plan submission

Planning objects and materials

RC

Reinforcing steel

Planning object for detailed reinforcement planning of sophisticated reinforced concrete structures.

S

Steel

Planning object for steel construction overview planning as well as excavation support.

C

Concrete / Reinforced concrete

Material for structural framework, formwork, and prefabricated elements, for which formwork and precast plans are created.

BIM

BIM / 3D modeling

Model-based planning and structured information exchange with all project stakeholders.

Locations

Standort Dreieich

Dreieich

DE

Office/Administration, Design office

Materials
Steel, Reinforcing steel, Reinforced concrete
  • ALLPLAN (Nemetschek)

Planning services

Terminal 3 Frankfurt – Overview
Terminal 3 Frankfurt – OverviewStructural framework and reinforcement planning · Infrastructure
Omniturm Frankfurt
Omniturm FrankfurtFormwork and reinforcement planning · High-rise construction
Wannsee Terraces Berlin
Wannsee Terraces BerlinFormwork and reinforcement planning · High-rise construction
The Berlin Palace
The Berlin PalaceReinforcement planning · High-rise construction

Inside the production

Visualization of the arrival hall of Terminal 3 at Frankfurt Airport
Visualization of the arrival hall of Terminal 3 at Frankfurt Airport
Visualization of a pier with gates in Terminal 3 at Frankfurt Airport
Visualization of a pier with gates in Terminal 3 at Frankfurt Airport
Visualization of the check-in hall of Terminal 3
Visualization of the check-in hall of Terminal 3
Visualization of the terminal hall with glass facade
Visualization of the terminal hall with glass facade
Aerial view of the site for Terminal 3 at Frankfurt Airport
Aerial view of the site for Terminal 3 at Frankfurt Airport
Visualization of the marketplace in Terminal 3
Visualization of the marketplace in Terminal 3
Visualization of the exterior view of Terminal 3
Visualization of the exterior view of Terminal 3
Wannsee Terraces Berlin, entrance area
Wannsee Terraces Berlin, entrance area
Wannsee Terraces Berlin, garden side
Wannsee Terraces Berlin, garden side

Industries

High-rise constructionCivil engineeringIndustrial constructionEngineering officesConstruction companies

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Structural framework drawingsEngineering–––––
Formwork plansEngineering–––––
Reinforcement plansEngineering––––Reinforced concrete
Steel construction overview planningEngineering––––Steel
Excavation support and borehole pile plansEngineering–––––
3D modeling & BIM coordinationEngineering–––––
Precast element plansEngineering––––Concrete/Precast elements

1 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
CAD/BIM softwareNemetschek ALLPLAN–––Dreieich

Additional services

Structural framework drawingsFormwork plansReinforcement plansSteel construction and specialized planning (Overview, excavation support, borehole pile plans)Precast element plans3D modelingBIM coordination

Reference customers

Fraport AG (Terminal 3 Frankfurt)GSI Helmholtzzentrum (FAIR Darmstadt)Omniturm FrankfurtWannseeterrassen BerlinThe Berlin Palace

Quality

The responsible project manager accompanies, reviews, and coordinates the construction work and remains the direct contact person for the entire project. Clear review and coordination processes ensure plan quality; since 2020, there has been BIM certification by ALLPLAN.

EvidenceDreieich
BIM Certification (ALLPLAN)

History

  1. 1986

    Founding of Sebastian Zehentner Technical Drawings GmbH in Dreieich.

  2. 2005

    Completion of drawing services for Berlin Palace (364 reinforcement plans).

  3. 2013

    Completion of drawing services for Wannsee Terraces Berlin.

  4. 2018

    Completion of drawing services for Omniturm Frankfurt (233 formwork plans, 839 reinforcement plans).

  5. 2019

    Founding of Zehentner + Ingenieure Technical Drawings GmbH as successor; assumption of all employees.

  6. 2020

    BIM certification by ALLPLAN.

  7. 2021

    Completion of drawing services for Terminal 3 at Frankfurt Airport (277 structural framework drawings, 1,016 reinforcement plans).

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account