
Civil engineering company for road, sewer, pipeline, hydraulic and earthworks construction in East Thuringia

ZeuTie Tiefbau GmbH
07937 Zeulenroda-Triebes · GermanyNew on Amplifa
About ZeuTie Tiefbau
ZeuTie Tiefbau GmbH is a medium-sized construction company in East Thuringia headquartered in Zeulenroda-Triebes. Founded in 1968, the company has around 35 employees and carries out road construction, paving, sewer construction, pipeline construction, hydraulic engineering and earthworks. Its range of services includes complete roads, paths and squares, both bituminous and in all paving techniques, as well as wastewater systems in almost every dimension, including structures, small sewage treatment plants, rainwater collection tanks and grease traps. In pipeline construction, the company has been working for various utility companies for years, from the main line to the complete house connection; particular expertise lies in small reservoir and pond construction as well as in cable construction. The projects are carried out predominantly in the regional environment of approximately 50 km around Zeulenroda, with an annual turnover of approx. EUR 3.5 million.
- Site
- Zeulenroda-Triebes
- Processes
- Road construction, Paving construction (all paving techniques), Sewer construction, Pipeline construction (water pipeline construction), Hydraulic engineering (small reservoir and pond construction), Earthworks (earthmoving, excavation), Supply and installation of fully biological small sewage treatment plants incl. brokering of, Cable construction
- Materials
- Bituminous road construction, Paving stones
- Certificates
- Quality assurance sewer construction AK2, DVGW certificate
- Founded
- 1968
- Employees
- approx. 35
- Industries
- Civil engineering, Road construction, Water supply / utility companies, Wastewater disposal, Private clients
- 01
Earthworks / excavation
- 02
Pipeline and sewer construction
- 03
Road and paving construction
- 04
Assembly and handover
Building materials and construction methods
Bituminous road construction
Asphalt construction methods for roads, paths and squares
Paving stones
All paving techniques, also for private outdoor facilities
Locations
Zeulenroda-Triebes
DEHead office / construction site
- Materials
- Bitumen, paving stones
Areas of expertise





Inside the production





Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Road constructionEngineering | – | – | – | – | Bitumen, Paving stones |
| Paving construction (all paving techniques)Engineering | – | – | – | – | Paving stones |
| Sewer constructionEngineering | – | – | – | – | – |
| Pipeline construction (water pipeline construction)Engineering | – | – | – | – | – |
| Hydraulic engineering (small reservoir and pond construction)Engineering | – | – | – | – | – |
| Earthworks (earthmoving, excavation)Engineering | – | – | – | – | – |
| Supply and installation of fully biological small sewage treatment plants incl. brokering ofEngineering | – | – | – | – | – |
| Cable constructionEngineering | – | – | – | – | – |
Additional services
Quality assurance and certification
In sewer construction, quality assurance of group AK2 applies; in pipeline construction, a DVGW certificate is held.
| Evidence | Zeulenroda-Triebes |
|---|---|
| Quality assurance sewer construction AK2 | |
| DVGW certificate |
History
- 1968
Founded as Meliorationsgenossenschaft Zeulenroda (land improvement cooperative); from the three-man operation at the Kleinwolschendorfer Straße site, an active civil engineering firm developed