Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Angele Kabelbau – Fertigung

Specialist company for cable and civil engineering, overhead line construction, street lighting construction as well as cable installations up to 20 kV.

Angele Kabelbau Logo

Angele Kabelbau GmbH & Co. KG

Lech/Ostallgäu region, Bavaria · DENew on Amplifa

1995Founded

About Angele Kabelbau

Angele Kabelbau GmbH & Co. KG was founded in 1995 as a partner for cable and electrical construction and has since been active in the field of energy and telecommunications infrastructure. Core services include cable and civil engineering including the laying of supply cables, house connections, cable trenches, and trenchless laying by ramming, horizontal drilling, core drilling, and the Liebherr KV15 cable plow. In addition, the company builds overhead lines in the low- to medium-voltage range including concrete, steel, and wooden poles, earthing systems, and transformer stations, manufactures street lighting installations from delivery to commissioning, and carries out cable installations for 0.4 to 20 kV systems using various installation techniques. Customers include Deutsche Telekom, EnBW, and LEW Lechwerke, as well as many cities and municipalities as framework contract partners. Maintenance, servicing, system documentation, and measurement reports round out the service portfolio. The site is located in the Lech/Ostallgäu region (area code 08395).

Site
Lech/Ostallgäu region
Processes
Cable and civil engineering (laying of supply cables, house connections, cable trenches), Cable pulling and cable blowing work, Horizontal drilling and core drilling, Trenchless cable and pipe laying by ramming, Laying work with the Liebherr KV15 cable plow (trenchless laying), Installation of low-voltage and medium-voltage systems (0.4 to 20 kV), Cable installations (wrapping technique, cold and hot casting technique, resin casting technique,, Overhead line construction LV/MV/street lighting incl. poles (concrete, steel, wood), earthing
Materials
Cable plow method (Liebherr KV15), Ramming / horizontal drilling, Cable installation techniques
Founded
1995
Industries
Energy supply, Telecommunications, Cities and municipalities
  1. 01

    System design

  2. 02

    Civil engineering / cable trench and trenchless laying

  3. 03

    Cable pulling and cable blowing

  4. 04

    Cable and overhead line installation

  5. 05

    Commissioning, system documentation, and measurement reports

  6. 06

    Maintenance and servicing

Processes and Techniques

KV15

Cable plow method (Liebherr KV15)

Trenchless laying with minimal ground intervention; the pipe is inserted stress-free into the slot.

PRESS

Ramming / horizontal drilling

Trenchless crossing of roads for cable and pipe laying.

MONT

Cable installation techniques

Wrapping, cold and hot casting, resin casting, screw, compression, slide-on, and plug-in techniques for 0.4 to 20 kV.

Locations

Standort Headquarters Lech/Ostallgäu

Headquarters Lech/Ostallgäu

DE

Headquarters with machine fleet and installation personnel

  • Cable plow Liebherr KV15
  • Trucks 7.5–24 t with loading crane and work platform basket (up to 22 m reach)
  • Low-loader trailers
  • Mobile work platforms 13.5 and 23 m
  • Mini excavators 3.5–4.5 t
  • Mobile excavators 7.5–14 t
  • Cable pulling winches
  • Cable blowing machines
  • Core drilling equipment
  • Earth rockets 70–130 mm
  • Roller compactor BW175
  • Asphalt hot-mix kettle
  • Measuring devices for cable measurements

Inside the production

Cable plow Liebherr KV15
Cable plow Liebherr KV15
Cable laying
Cable laying

Industries

Energy supplyTelecommunicationsCities and municipalities

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Cable and civil engineering (laying of supply cables, house connections, cable trenches)Installation–––––
Cable pulling and cable blowing workInstallation–––––
Horizontal drilling and core drillingInstallation–––––
Trenchless cable and pipe laying by rammingInstallation–––––
Laying work with the Liebherr KV15 cable plow (trenchless laying)Installation–––––
Installation of low-voltage and medium-voltage systems (0.4 to 20 kV)Installation–––––
Cable installations (wrapping technique, cold and hot casting technique, resin casting technique,Installation–––––
Overhead line construction LV/MV/street lighting incl. poles (concrete, steel, wood), earthingInstallation––––Concrete, Steel, Wood
Street lighting construction (delivery, installation, commissioning, maintenance)Installation–––––
Tar work / asphalt workInstallation–––––

16 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Cable plowLiebherr KV15––––
Truck––7.5 to 24 tonnes, some with loading crane and work platform basket up to 22 metres reach––
Low-loader trailer–––––
Mobile work platform–213.5 and 23 metres reach––
Mini excavator–several3.5 to 4.5 tonnes––
Mobile excavator––7.5 to 14 tonnes––
Cable transport trailer–––––
Cable pulling winch–––––
Cable blowing machine–––––
Core drilling machine–––––
Earth rocket––70 to 130 mm––
Pole transport trailer–––––
Roller compactorBW175––––
Mobile roller––1.5 tonnes––
Asphalt hot-mix kettle–––––
Demolition hammer––for 3.5 to 14 tonne excavators––

Additional services

Cable and civil engineeringOverhead line constructionStreet lighting constructionCable installationsCable plow laying method (Liebherr KV15)Horizontal drillingCore drillingHouse connectionsMaintenance and servicingSystem documentation and measurement reports

Reference customers

Deutsche TelekomEnBWLEW Lechwerke

History

  1. 1995

    Company founded as a partner for cable and electrical construction

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo