Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Titan Wind – Fertigung

Manufacturing of XXL monopiles as steel foundations for offshore wind turbines in Cuxhaven

Titan Wind Logo

Titan Wind Energy (Germany) GmbH

27472 Cuxhaven · Berth 8, Port of CuxhavenNew on Amplifa

650Regional jobs (planned, Cuxhaven)
350,000 t/yearProduction capacity
750,000 m² (110,000 m² covered)Site area
up to 3,500 tMax. unit weight of monopile
up to 140 mMax. component length

About Titan Wind Energy

Titan Wind Energy (Germany) GmbH produces XXL monopiles — steel foundations for offshore wind turbines — in Cuxhaven. On a 750,000 m² site with 110,000 m² of covered production area, a production facility is being built that covers the entire manufacturing chain from steel plate via welded joints and coating through to the finished offshore foundation. The monopiles reach individual weights of up to 3,500 tonnes, lengths of up to 140 metres, diameters of up to 14 metres and wall thicknesses of up to 160 millimetres. The direct port connection at Berth 8 in the Port of Cuxhaven enables the delivery of steel plates by sea as well as just-in-time loading of the finished foundations at the quay edge. In addition, the company offers marshalling and staging services as well as pre-assembly of transition pieces. The planned production capacity is 350,000 tonnes per year with 650 regional jobs.

Site
Cuxhaven
Processes
Manufacture of XXL monopiles (steel foundations for offshore wind turbines), Welded joints, Coating, Pre-assembly of transition pieces onto XXL monopiles, Staging and marshalling services (marshalling service), Intermediate storage of monopiles (approx. 150 units) and loading, Marshalling service (staging and marshalling services), Pre-assembly of transition pieces
Materials
Steel (steel foundations/steel plates), Steel plate, Steel, Welding, Coating, Pre-assembly of Transition Pieces
Employees
650 (regional)
Industries
Offshore wind energy, Renewable energies, Heavy industry/steel construction
  1. 01

    Delivery of steel plates by sea using a heavy-lift crane

  2. 02

    Rolling and fabrication of the segments

  3. 03

    Welded joints

  4. 04

    Coating

  5. 05

    Intermediate storage (approx. 150 monopile slots)

  6. 06

    Pre-assembly of transition pieces / marshalling

  7. 07

    Loading at the quay edge and shipping

Materials and Processes

Stahl

Steel

Base material for XXL monopiles and steel foundations for offshore wind turbines.

Stahlblech

Steel plate

Starting material, unloaded by sea with heavy-lift cranes and used for manufacturing.

Schweißen

Welding

Manufacturing step used to join the segments along the entire production chain.

Coating

Coating

Corrosion protection of the monopiles before deployment in the North Sea.

Montage

Pre-assembly of Transition Pieces

Service option for pre-assembly of transition pieces onto the monopiles.

Site Cuxhaven

Standort Cuxhaven

Cuxhaven

DE

Production site with North Sea port connection (Berth 8)

Part weight / size
up to 3,500 t unit weight, up to 14 m diameter, up to 160 mm
Lot size
350,000 t/year production capacity
Materials
Steel, steel plate
  • Heavy-lift crane
  • Production halls (110,000 m² covered production area)
  • Intermediate storage area (approx. 150 monopiles)
  • Quay edge for loading

Components

XXL monopile (offshore foundation)
XXL monopile (offshore foundation)Welding/coating · Offshore wind energy
Transition piece (pre-assembly)
Transition piece (pre-assembly)Pre-assembly/marshalling · Offshore wind energy

Inside the production

Production site Cuxhaven
Production site Cuxhaven
Port connection at Berth 8
Port connection at Berth 8

Industries

Offshore wind energyRenewable energiesHeavy industry/steel construction

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Manufacture of XXL monopiles (steel foundations for offshore wind turbines)Joining–up to 140 m × up to 14 m diameterup to 3,500 t–Steel, Steel plate
Welded jointsJoining––––Steel
CoatingSurface––––Steel
Pre-assembly of transition pieces onto XXL monopilesAssembly––––Steel
Staging and marshalling services (marshalling service)Assembly–––––
Intermediate storage of monopiles (approx. 150 units) and loadingAssembly––up to 3,500 t––

3 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Heavy-lift crane–1––Cuxhaven
Production facility for steel foundations (production hall)––110,000 m² covered production area–Cuxhaven
Storage area––750,000 m² total area–Cuxhaven

Additional services

Manufacture of XXL monopiles (steel foundations for offshore wind turbines)CoatingWelded jointsMarshalling service (staging and marshalling services)Pre-assembly of transition piecesIntermediate storage of approx. 150 monopilesHeavy-lift crane unloading of steel plates delivered by seaLoading of the monopiles directly at the quay edge

History

  1. Construction of a state-of-the-art production facility for steel foundations for offshore wind turbines in Cuxhaven: conversion of existing halls plus planned new halls to create a complete production chain

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo