Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Manufacture of large steel structures, tower and machinery parts for the wind and offshore industry up to 120 t

TI

Titan Wind Operational Support ApS

Varde (DK) · Cuxhaven (DE, sister company Titan Wind Energy Europe)New on Amplifa

2012Acquisition of the Vestas tower factory by the Titan Group
CVR 38441337 (DK)Commercial register
42 m × 10 m × 8 m, Ø 5.5 mMaximum component dimensions
120 tMaximum unit weight
120 mm (up to 140 mm according toMax. plate thickness for rolling

About Titan Wind Operational Support

Titan Wind Operational Support ApS manufactures large steel components and steel structures in Denmark – from machined parts and assemblies to transport and lifting equipment and tower segments for the wind industry. The company looks back on more than 20 years of experience in tower production and was created through the acquisition of the former Vestas tower factory in Varde (2012). Its core processes include the rolling of steel plates up to 120 mm thickness (advertised as up to 140 mm on the product page), welded constructions according to EN 1090 and ISO 3834, as well as machining and assembly. The production hall in Varde allows components up to 42 m in length, 10 m in width, 8 m in height, 5.5 m in diameter and 120 t in weight. The main customers are the wind energy and offshore sectors (foundation structures) as well as general steel construction. In 2020, the sister company Titan Wind Energy (Europe) A/S acquired the Ambau plant in Cuxhaven with direct North Sea access in order to serve the offshore foundation market. All services are integrated into a quality management system covering ISO 9001, ISO 14001, ISO 45001, EN 1090 and ISO 3834.

Site
Varde, Denmark
Processes
Rolling of steel components (plate rolling) for wind and offshore installations, Rolling of large dimensions and complex profiles, Welded construction of steel structures (EN 1090, ISO 3834 certified), tower production for the, Blasting and painting (surface treatment from blasting through painting under one roof), Manufacture of large and complex steel structures and steel components, Machined parts and components, Manufacture of transport and lifting equipment (custom-built transport and lifting equipment), On-site inspection and repair, production consulting and project management
Materials
Steel
Certificates
ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, EN 1090, ISO 3834
Founded
2012
Industries
Wind energy, Offshore (foundation structures), Steel construction
  1. 01

    Blasting/surface preparation

  2. 02

    Plate rolling (up to 120 mm)

  3. 03

    Welded construction

  4. 04

    Machining

  5. 05

    Coating

  6. 06

    Quality inspection

  7. 07

    Transport and lifting equipment/assembly

  8. 08

    On-site inspection and repair

Materials and Processes

S

Steel

Structural steel for large welded steel structures, tower segments and offshore components

Locations

Varde

DK

Production facility (former Vestas tower factory)

Part weight / size
up to 120 t
Materials
Steel
  • Plate rolling machine (up to 120 mm plate thickness)
  • Crane system (6.5 m height under crane hook)

Industries

Wind energyOffshore (foundation structures)Steel construction

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Rolling of steel components (plate rolling) for wind and offshore installationsForming–8.0 meters––Steel
Rolling of large dimensions and complex profilesForming–42 meters × 10 meters × 8.0 meters120 tonnes–Steel
Welded construction of steel structures (EN 1090, ISO 3834 certified), tower production for theJoining–42 meters × 10 meters × 8.0 meters120 tonnes–Steel
Blasting and painting (surface treatment from blasting through painting under one roof)Surface––––Steel
Manufacture of large and complex steel structures and steel componentsForming–42 meters × 10 meters × 8.0 meters120 tonnes–Steel
Machined parts and componentsMachining––––Steel
Manufacture of transport and lifting equipment (custom-built transport and lifting equipment)Assembly––––Steel
On-site inspection and repair, production consulting and project managementTesting–––––

2 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Plate rolling machine (rolling up to 120 mm plate thickness according to table / up to 140 mm––max. plate thickness 120 mm (rolling)–Varde
Crane system (max. height under crane hook 6.5 m)––––Varde

Additional services

Steel construction manufacturing (components up to large steel structures)Tower production for the wind industryRolling of steel components (max. plate thickness according to services table 120 mm, on the GermanTransport equipment for wind turbine componentsHoists/lifting equipment for the wind industryOn-site inspection and repairConsulting on production and project managementCertification and inspection services (among others through the acquisition of Global WeldingSurface treatment/coating (Esbjerg site; operation of the coating plant 2026 handed over to BWO ApSMachined parts

Reference customers

Vestas (historical: acquisition of the Vestas tower factory; no active reference customer list

Quality and Certifications

Titan Wind Operational Support operates with an integrated quality management system that covers all required certificates and standards (ISO 9001, ISO 14001, ISO 45001, EN 1090, ISO 3834). An in-house QC department with QC Manager (IWS), Coating & Quality Engineer and QC Specialists accompanies the manufacturing process.

EvidenceVarde
ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
EN 1090
ISO 3834

Company History

  1. 2012

    The Titan Wind Energy division in Singapore takes over the former Vestas tower factory in Denmark; production continues as Titan Wind Energy (Europe) A/S.

  2. 2014

    Titan Wind Energy (Europe) A/S takes over the surface treatment facility in Esbjerg from Gardit A/S.

  3. 2015

    Upgrade of the surface treatment facility in Esbjerg to enable blasting through painting under one roof.

  4. 2017

    Foundation of “Titan Operational Support” with services such as on-site inspection, repair and consulting on production and project management.

  5. 2018

    Acquisition of Global Welding Control to expand certification and inspection services.

  6. 2020

    Titan Wind Energy (Europe) A/S takes over the production facility of Ambau in Cuxhaven with direct North Sea access for the offshore foundation market.

  7. 2026

    Operation of the coating plant in Esbjerg handed over to BWO ApS.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo