Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Design, development, manufacturing, installation and service of onshore and offshore wind turbines

VE

Vestas Wind Systems A/S

Aarhus N · Copenhagen S · Videbæk · Hamburg · Berlin · Husum · Rheine · Vienna · Varna · Vaasa · Puteaux (Paris) · Pérols · Athens (Maroussi) · Dublin · RomeNew on Amplifa

1945Founded
+35.000Employees worldwide
+207 GWInstalled capacity in 88 countries
+165 GWCapacity under service
1.701.000 tMaterial consumption 2024

About Vestas

Vestas Wind Systems A/S is a Danish manufacturer of wind turbines headquartered in Aarhus. The company develops, manufactures, installs and maintains onshore and offshore wind turbines as well as turbine components such as rotor blades, nacelles and towers. The value chain encompasses engineering, component manufacturing (glass/carbon composites for rotor blades, steel and hybrid towers, nacelle assembly), project installation, and a globally positioned service business with maintenance, spare parts, repairs and multibrand service for third-party platforms. Key materials are steel and iron (around 88% of turbine mass), concrete, glass/carbon composites, polymers, aluminium and copper; rare earths are used in the permanent magnets of the generators. For 2024, global material consumption amounted to 1,701,000 tonnes. With more than 207 GW of installed capacity in 88 countries and around 56,000 turbines under service in 71 countries, Vestas is one of the largest providers in the industry. In Germany, the company is represented by Vestas Deutschland GmbH in Hamburg (approx. 2,000 employees), Berlin, Husum and Rheine.

Site
Aarhus N
Processes
Design, development and manufacture of onshore wind turbines, Design, development and installation of offshore wind turbines, Wind turbine maintenance (Maintenance/Service of wind turbines), Gearbox Replacement (multibrand), Generator Replacement (multibrand), Main Bearing Replacement, Blade Bearing Replacement, Transformer Replacement
Materials
Steel materials, Iron materials, Concrete, Glass / carbon composites, Polymer materials, Aluminium and alloys, Copper and alloys, Rare earth elements (permanent magnets)
Certificates
ISO 9001, IATF 16949
Founded
1945
Employees
+35.000
Industries
Wind energy, Renewable energies, Energy supply
  1. 01

    Engineering and design of wind turbines

  2. 02

    Component manufacturing (rotor blades, nacelles, towers)

  3. 03

    Supply chain with more than 1,200 suppliers worldwide

  4. 04

    Installation onshore/offshore

  5. 05

    Service, maintenance, spare parts and repair

  6. 06

    Digital services and fleet optimisation

Materials and Processes

St

Steel and iron

Around 88% of turbine mass (e.g. V162-6.2 MW); in 2024, 1,110,000 t of steel and 185,000 t of iron were processed.

Bet

Concrete

Used in hybrid towers made of concrete and steel segments; consumption of 186,000 t in 2024.

GFK/CFK

Glass/carbon composites

In-house manufacture of rotor blades; consumption of 105,000 t in 2024.

Pol

Polymers

Composite and polymer materials for rotor blades and turbine components; 68,000 t in 2024.

Al

Aluminium and alloys

Turbine components; consumption of 19,000 t in 2024.

Cu

Copper and alloys

Electrical components and generators; consumption of 11,000 t in 2024.

SE

Rare earths

Permanent magnets in generators of the EnVentus platform; all current turbines use gearless concepts with reduced usage.

Holz

Wood (towers)

Stake in Modvion for the manufacture of wind turbine towers made of wood.

Industries

Wind energyRenewable energiesEnergy supply

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Design, development and manufacture of onshore wind turbinesEngineering––––Steel, Iron, Copper, Aluminium, Glass/carbon composites, Polymers
Design, development and installation of offshore wind turbinesEngineering–––––
Wind turbine maintenance (Maintenance/Service of wind turbines)Assembly–––––
Gearbox Replacement (multibrand)Assembly–––––
Generator Replacement (multibrand)Assembly–––––
Main Bearing ReplacementAssembly–––––
Blade Bearing ReplacementAssembly–––––
Transformer ReplacementAssembly–––––
Single Blade Removal & Installation / Rotor Removal & InstallationAssembly–––––
Gearbox/Generator AlignmentAssembly–––––
Yaw Gear ReplacementAssembly–––––
Gearbox Uptower Repair Solutions (HSS and IMS)Assembly–––––
Pitch component service (pitch cylinder/motor/controller/battery replacement, hydraulic motor)Assembly–––––
Scheduled Maintenance (6-month and 12-month service)Testing–––––
Inspections (blade, gearbox, transformer, foundation)Testing–––––
Rotor blade manufacturing (fibreglass/composite components, in-house production)Plastics––––Glass/carbon composites, Polymers
Tower manufacturing (until 2021; steel and hybrid towers)Joining––––Steel, Concrete
Nacelle manufacturingAssembly––––Steel, Iron, Copper, Aluminium
Spare Parts / Repair SolutionsAssembly–––––
Fleet Optimisation / Digital Services (Scipher®, VestasOnline)Engineering–––––
Multibrand service for third-party platforms (Siemens, Gamesa, Senvion, Suzlon, Nordex, Alstom, GE)Assembly–––––

6 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Tower factory––––Pueblo, Colorado (sold to CS Wind in 2021)
Rotor blade factory––––Windsor, Colorado
Nacelle manufacturing facility––––Brighton, Colorado
Rotor blade factory––––Lauchhammer (closed in 2021)
Production facilities (blades, nacelles, towers)––––Lem, Nakskov, Isle of Wight, Taranto, Tianjin, Daimiel
Test field / test facility (industry's largest testing facility)–––––

Additional services

Onshore wind turbines (design, development, manufacturing, installation)Offshore wind turbinesService / maintenance / upkeep (multibrand)Fleet OptimisationDigital services (VestasOnline, Scipher®, VestasDeveloper, ShopVestas)Spare parts and repairsProject development (renewable energy projects)

Quality

Vestas maintains high standards of quality, durability and performance along the entire value chain and expects the same from suppliers. The service network comprises more than 11,000 service technicians in 71 countries; turbines are extensively tested in the company's own testing facility, the largest in the industry.

EvidenceAarhus N
ISO 9001
IATF 16949

History

  1. 1898

    Hans Smith Hansen buys a smithy in Lem, West Jutland

  2. 1945

    Founded as Vestjysk Stålteknik A/S by Peder Hansen; initially household appliances

  3. 1950

    Focus on agricultural machinery

  4. 1956

    Manufacture of intercoolers

  5. 1968

    Production of hydraulic cranes for light trucks

  6. 1979

    First wind turbine sold

  7. 1980

    Start of series production of wind turbines; first 80 turbines of 55 kW each

  8. 1981

    First orders from the USA

  9. 1987

    Foundation of Vestas Wind Systems A/S, exclusive focus on wind energy

  10. 1995

    Construction of the Tunø Knob offshore wind farm (10 x V39-500 kW)

  11. 1998

    IPO on the Copenhagen Stock Exchange

  12. 2003/2004

    Merger with NEG Micon A/S

  13. 2013

    Relocation of headquarters from Randers to Aarhus; joint venture MHI-Vestas with Mitsubishi Heavy Industries

  14. 2015

    Acquisition of UpWind Solutions (USA); 55,000th turbine erected

  15. 2016

    Acquisition of Availon (Germany)

  16. 2019

    Introduction of the EnVentus platform

  17. 2021

    Closure of plants including the Lauchhammer rotor blade factory; sale of the Pueblo tower factory to CS Wind

  18. 2022

    Presentation of the V172-7.2 MW

  19. 2024

    Prototype V162-7.2 MW erected in Janneby

  20. 2025/2026

    First installation of 200 GW of wind turbines worldwide; more than 207 GW of installed capacity

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo