About Wattical Energon Tech

Wattical Energon Tech GmbH is an engineering and project development company for stationary battery storage systems (BESS). The company supports industrial customers, grid operators and energy traders through the entire project lifecycle: from feasibility studies, grid pre-applications and technical dimensioning, through single-line diagrams, interface concepts and protection systems, to procurement, construction management, hardware integration and turnkey commissioning. A key focus is grid integration and compliance with VDE-AR-N 4110/4120 across more than 800 distribution network operators with individual requirements. Originating from battery testing technology, Wattical has its own battery test systems and data-based evaluation of BESS with regard to performance, safety and technical risks. The collaboration with Hyperstrong secures direct access to international BESS technology and Tier-1 component manufacturers. Technology and component selection is project-specific and manufacturer-independent.

Processes
EPC & project implementation (battery storage projects), Grid integration & VDE compliance (VDE-AR-N 4110/4120), Technical planning & system design (SLD, interface concepts, protection systems), Battery testing (in-house test systems and test infrastructure), System integration of hardware and software systems (BMS & EMS), EPC & project implementation of battery storage projects, Supply chain & manufacturer access (Tier-1 component manufacturers), Feasibility studies, grid pre-applications, technical dimensioning
Materials
EPC & Project Implementation, Grid Integration & VDE Compliance, Technical Planning & System Design, BMS & EMS System Integration, Battery Testing & System Evaluation
Industries
Energy industry, Battery storage (BESS), Grid operators/distribution network operators, Energy trading
  1. 01

    Feasibility study, grid pre-application and technical dimensioning

  2. 02

    Technical planning & system design (SLD, interface concepts, protection systems)

  3. 03

    Procurement via Tier-1 component manufacturers (supply chain & manufacturer

  4. 04

    Construction management and on-site hardware integration

  5. 05

    Grid integration and VDE compliance (VDE-AR-N 4110/4120)

  6. 06

    Turnkey commissioning, certification and handover to operation

Services & Processes

EPC

EPC & Project Implementation

Holistic realization of battery storage projects from planning through procurement to commissioning.

VDE-AR-N 4110/4120

Grid Integration & VDE Compliance

Technical clarification, coordination with distribution network operators and certification of the grid connection.

SLD

Technical Planning & System Design

Creation of single line diagrams, interface concepts and protection systems.

BMS/EMS

BMS & EMS System Integration

Integration of hardware and software systems between battery storage, energy management system and grid connection point.

BESS-Test

Battery Testing & System Evaluation

In-house battery test systems and test infrastructure for data-based evaluation of performance, safety and technical risks.

Industries

Energy industryBattery storage (BESS)Grid operators/distribution network operatorsEnergy trading

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
EPC & project implementation (battery storage projects)Engineering–––––
Grid integration & VDE compliance (VDE-AR-N 4110/4120)Engineering–––––
Technical planning & system design (SLD, interface concepts, protection systems)Engineering–––––
Battery testing (in-house test systems and test infrastructure)Testing––––Lithium-ion batteries (BESS)
System integration of hardware and software systems (BMS & EMS)Engineering–––––

Additional services

EPC & project implementation of battery storage projectsGrid integration & VDE compliance (VDE-AR-N 4110/4120)Technical planning & system design (SLD, interface concepts, protection systems)Supply chain & manufacturer access (Tier-1 component manufacturers)Feasibility studies, grid pre-applications, technical dimensioningProcurement, construction management and hardware integrationTurnkey commissioning, certification and handoverData-based system selection and evaluation of BESSIn-house battery test systems and test infrastructure

Reference customers

Hyperstrong (technology partnership)

History

  1. 2024

    Origin in battery testing technology; presence as Wattical Energon Tech GmbH according to the website (© 2024), transfer of testing expertise to the evaluation and optimization of modern BESS projects.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo